For a 100mm slab.
Expansion joints concrete slabs spacing.
Saw cutting cuts joints as soon as the concrete is hard enough that the edges abutting the cut don t chip from the saw blade.
It is also influenced by the slab dimensions type of concrete and the reinforcing materials being used.
Tips for placing concrete expansion joints place joints around 30 times the slab thickness apart.
They need to be at least a quarter of the thickness of the slab.
Joints are commonly spaced at distances equal to 24 to 30 times the slab thickness.
How to cut joints groover tools cut joints in fresh concrete.
Joint spacing in meters.
They should also be placed around structures that go deeper than the concrete slab such as columns or walls.
When using joint groove for contraction joints the joint should be a minimum depth of thickness of the slab.
So for a slab which is 100mm thick the joints should be placed.
It is also important to keep slabs as square as possible.
So for a 4 inch thick concrete slab expansion joints should be no more than 8 to 12 feet apart.
Cracks in concrete may occur at the expansion joints due to improper concrete mix or curing.
Joint spacing that is greater than 15 feet require the use of load transfer devices dowels or diamond plates.
Cut joints deep enough cut joints 25 of the depth of the slab.
If you have a 4 inch slab and multiply it by 24 to 32 you will find that your joints should be placed every 96 to 144 inches or 8 to 12 feet if you have a 5 inch slab and multiply it by 24 to 32 you will find that your joints should be placed every 120 to 180 inches or 10 to 15 feet.
Saw cut joints should be done within 4 to 12 hours after the concrete has been finished.
Joint spacing in feet contraction joints may be tooled into the concrete surface at the time of placement.
A 4 slab should have joints 8 12 feet apart.
Transverse joint spacing should not exceed 125 to 150 of the longitudinal joint spacing.
Space joints in feet no more than 2 3 times the slab thickness in inches.
Maximum joint spacing should be 24 to 36 times the thickness of the slab.
This tool provides an estimate of the maximum allowable joint spacing based on the slab thickness and the subgrade subbase used two of the variables with the most prominent effect on joint spacing requirements.
Make sure joints are cut deep enough.
A 4 thick slab should have joints 1 deep.
The expansion joint gap depends on the type of slab like floating slab floor vehicle pavement sidewalk or monolithic slab foundation.
Typically for jointed plain concrete streets the joint spacing should be 24 to 30 times the pavement thickness with a maximum spacing of 15 ft 4 5 m.
Longitudinal joint spacing on two lane and multilane concrete pavements typically is about 10 to 13 ft 3 0 to 4 2 m.